- This topic has 2 replies, 3 voices, and was last updated 8 years ago by .
-
Topic
-
We are an AIX shop using CLVF 6.0.2 We are looking at moving to Linux.
So we spin up a VM and load it with RedHat 5.9 (certified disto)
then tar up on “stuff” and drop it on to the new box and away we go..right?
BUT.. what about the thru put, how many cores to do I need?
What about scripting?
Has anyone out there been through this?
We have 700 threads across 15 sites.
I guess I am looking for advice and WHERE to start this project and from my view point it is how big of a Linux box do I need to support my current AIX production environment, then I build a sand-box and begin my journey.
Thanks in advance for the guidance.
Viewing 1 reply thread
Viewing 1 reply thread
- The forum ‘Operating Systems’ is closed to new topics and replies.