I’ve been reading through previous topics and there is a lot out here that says don’t use advanced scheduling without a tcl or use another scheduling job to do the ftp.
What exactly is the purpose of the advanced scheduling option, and does it really work?
I’m on 5.6 rev 2, and I have the delay until needed option checked in my protocol. Is there something else I need?
Thanks in advance.