Guys, first time I have had to work the CL upgrade. We are upgrading from 6.1 to 6.1.1. Can I run produciton in 6.1 and test as 6.1.1 on different servers of course and still be ablet to migrate 6.1 changes to production
Yes, for the most part you should be able to migrate test 6.1.1 configurations to prod 6.1; as you recall the configuration files are basically plain text files.
What you would want to do though is verify the configuration file by loading it in the respective tool on the production side once you’ve migrated it; i.e. if you updated an Xlate, simply load the migrated Xlate in the Translation Configurator and insure that it loads cleanly. Additionally, you could run a Compile or Verify within the tool to further confirm.
Hope this helps.