- This topic has 1 reply, 2 voices, and was last updated 11 years, 4 months ago by .
-
Topic
-
We’re planning on upgrading from 5.6 to 6.0 AND migrating from HP UX to Linux at the same time. I’m interested in any gotchas/considerations with this approach. For example, does the 6.0 install process perform any conversions on existing TCL scripts, formats, xlates, etc? I’m thinking we’ll install 6.0 on the new box (which has never had Cloverleaf running on it), then copy over our two sites (one live, one test/development) so the 5.6 objects won’t exist when 6.0 is installed. Curious to know if anyone has done this or is aware of problems with this approach. FWIW we get CL via a reseller (McKesson).
Viewing 0 reply threads
Viewing 0 reply threads
- The forum ‘Cloverleaf’ is closed to new topics and replies.