- This topic has 11 replies, 9 voices, and was last updated 13 years, 10 months ago by .
-
Topic
-
I am sure like most, we have a test site and a production site set up on our cloverleaf engine. We have only been using Cloverleaf for about a year, since we went live with various McKesson products. During that process we were starting fresh in a test environment so at go-live we just copied everything from test into production, including the netconfig file then changed ports and IP’s as needed. Now, a year later, we have several projects in the works some of which involve a good number of threads, XLT files, TCL code, etc that need to move from test to production. Moving XLT, TCL, tables, etc is just a matter of copying the files from the test site to the production site but copying the threads is a different matter. What are my best options, other than manually recreating the procs and threads in production?
- The forum ‘Cloverleaf’ is closed to new topics and replies.