I need to promote a test site to production. Normally I just add a thread as needed to existing production but this time we are promoting a pretty heavy project.
I know in theory that I should be able to “save as” my test area NetConfig and then use that copy in prod. My experience is that the view file gets out of sync and I have a mess on my hands every time I’ve tried this.
I’m on 5.4.1 btw.
Even when I’ve tried to copy the view file, it didn’t seem to work right.
Can someone give me step by step instructions on doing this?
I’m good with moving the rest, tclprocs, variants, etc.
I just need help with the NetConfig and View file.
Thanks in advance.