      Wanted to ask the community if there are any specific standards followed when looking at the size of Cloverleaf sites i.e. X amount of threads or processes determines when to split a site or if it’s dependent on a site volume or maybe both.  Is there any recommendation to how many threads per process that determines when a process should be split out into multiple processes.   Below is a break down of sites with threads/process count curious to hear what conventions other health systems follow in this regard.

       

      <td width=”75″>site
      <td width=”71″>ThreadCnt
      <td width=”75″>ProcessCnt
      epicf1 137 18
      ewd 123 43
      cac 119 39
      epict1 115 17
      seo 101 29
      smd 99 30
      sae 95 29
      theradoc 86 6
      sjst1 80 25
      emrc 72 13
      epicadt1 70 7
      sjsf1 70 24
      wwd 68 23
      sfl 67 20
      ephi 56 26
      emra 53 18
      emrdfh 52 14
      pyxis 50 14
      hshs 50 15
      dbmtn 49 14
      lab 49 13
      sjcf 48 15
      sjb 48 15
      sjh 43 16
      sjst2 42 14
      gss 41 13
      imaging 39 11
      shect1 38 11
      pos 32 4
      hfg 32 8
      conversion 31 17
      shecf1 29 12
      epicsynd 28 10
      trans 26 7
      sns 24 9
      labhist 23 8
      sql_lite 23 9
      emrbg 22 11
      onbase 22 6
      vituity 21 3
      cid 18 7
      svgb 15 7
      atlas 15 5
      ephny 14 5
      medgrp 14 5
      accumen 12 4
      empi 10 3
      unipoc 10 5
      sid 10 4
      emrie 9 3
      scottcr 8 4
      sco 7 3
      idph 6 2
      ccd 6 6
      smgb 4 2
      riskmgt 4 2
      prov 4 2
      myrnding 4 2
      chgconv 2 1
    Viewing 1 reply thread
    • Author
      Replies
      • #113879
        Jim Kosloskey
        Participant

          I have assisted multiple organizations to setup multi-site architecture.

          I do not believe there is a general cookbook formula.

          In most cases it requires a fair amount of information regarding the workload, etc.

          There have been a number of posts on the forum with the approaches others have used.

          I think more information would be needed to give specific recommendations.

          email: jim.kosloskey@jim-kosloskey.com 29+ years Cloverleaf, 59 years IT - old fart.

        • #113915
          Jeff Dawson
          Participant

            Thanks Jim for the reply,

            We’ve referenced the Infor published Cloverleaf Best practices document in the past, see attached, but noticed it was dated back in 2014.  I can open a ticket to see if there is an updated copy with Infor.  I have gone through and read some posts you’ve alluded to but those are bit dated and was checking just to see if anything from a Cloverleaf design has changed with the new versions of 6.2.4.0 and beyond with the addition of SMAT DB or if any recent users from the community on newer versions had any experiences to share.

            Attachments: